Scope:
The project consists of a four pipe fan coil system across all four floors complete with full mechanical room located on the first floor complete with hydronic package. Rooftop equipment shall have ERU’s, makeup air unit, air cooled chiller, VRF heat pump, fans, and various condensers. First floor shall have a shell tenant space for future.
Summary:
The Bence project consists of the construction of a new 20,238 sq. ft., 4 story office building. This project is scheduled to begin in November 2017 and finish September of 2018.
Unique Features:
The building shall have the utilities furnished and installed under this scope for a future full service kitchen.